Our list of satisfied clients keeps increasing over time. This is due to our commitment and passion for high quality construction and timely delivery. This is apparent in all our projects. We always aim to deliver the best to our customers using our 35 years of experience in construction business. This is why our every project that we build is well thought out and down to the last detail from building to interior designing. We have the ability and experience to deal with the local city officials for obtaining relevant approvals. Buildings that we have built are usually designed by Architects. We have so far built more than 600,000 square feet in and around Chennai. Our team leads have Engineering educational background added with vast experience in building individual Homes, Apartments, and commercial buildings.

 

Real Estate – Building & Construction

Stage 1

Stage 2

We build for you

Our Building Services provides a reliable and transparent building construction process. How we do it ~ is listed below.

Step 1

The Property owner provides the following
a) Location of the Property
b) Arrange for Site Visit

Step 2

a) The property owner will enter into a MOU (Memorandum of understanding) with builder.
b) Property Owner and builder (Contractor ) agree upon per Square Feet Rate for the construction
c) Token Advance of Rs. 50,000/- to be paid by the Property Owner to start Drawings. This amount is adjustable against the final settlement value of the contract

Step 3

a) Preparation of Working Drawing by Contractor
b) Approval of (preliminary) working drawing by both parties
c) Prepare Drawing required for Government Approval (See Annexure 1)
d) Owner provides copies of Property Documents including Sale Deed, Parent document, Town Survey Land Record (TSLR), Field Measurement (FM) and latest Encumbrance Certificate (EC) covering the sale deed period and minimum of 13 years
e) Application papers to be filled with Government Department and signed. If the owners are not in Town – the owners have the option of using his/her registered Power of Attorney (POA) to sign the forms
f) Enter into Contract Agreement and 10 % of total contract value to be given to Contractor ( Annexe 2)

Step 4

a) Electricity – temporary EB supply will be obtained from the Electricity department. EB Charges ( See Annexure 1 )
b) Construction Work commences after receiving approval from concerned departments. { The approval depends on the number of floors, plot extend and width of the road
c) Water supply – (1) If water is already available in property we will use it depending upon the capacity. If there is shortage of water additional water will be purchased for construction purpose ( See Annexure 1 )
(2 ) Water is not available – Bore has to be drilled. ( See Annexure 1 )

Step 5

a) RCC Sump construction ( See Annexure 1 )
b) Foundation – based on the soil condition suitable foundation will be laid
c) Basement work
d) Column raising
e) Roofing
f) Brick work
g) Wood Work  – Door and window frames

Step 6

a) Electrical concealed work – necessary points will be provided
b) EB  Wiring Work
c) Inner wall and Ceiling plastering
d) Plumbing concealed work
e) Kitchen Platform works
f) Over Head Tank ( See Annexure 1 )
g) Weathering Course work

Step 7

a) Outer plastering
b) Painting work – inner and outer – putty and primer work
c) Tiles laying work -Vitrified Tiles (2×2)
d) Door and Window Shutters , Window grills
e) Toilet Fittings
f) Electrical Switches

Step 8

a) Converting Temporary Electricity supply to Permanent connection, # of required EB connection for # of dwellings ( See Annexure 1 )
b) Metro water Connection,  Sewage and Drainage connections ( See Annexure 1 )
c) Septic Tank  to be constructed if Sewage connections are not available
d) Final Painting – inner and outer
e) Installation of Gates ( See Annexure 1 )

SCHEDULE FOR EXTRA WORK APART FROM MAIN BUILDING ( Annexe 1 )

• Rain water harvesting pit and wastewater collecting pit.
• Motor room /Security Room / Servant Room
• Building approval Fees & Miscellaneous Charges
• Temporary and permanent EB connection Fees and Misc charges
• Electricity Charges during construction billed Bi-monthly
• Safety grills
• Septic tank.
• Elevation work ( Other than standard elevation)
• Over head tank.
• Purchase of Water ( if required)
• Bore well with the motor.
• Pavement work outside the building.
• Compound wall
• Compound Wall Gate
• RCC Sump
• Metro Water and Sewage connection- Fees & Misc expenses
• Any miscellaneous expenses required for a smooth construction process.

Specifications

EARTHWORK, SAND FILLING, DUMMY COLUMN WORK, PLINTH BEAM, BRICKWORK, LINTELS BEAM, SUNSHADES, R.C.C. ROOF SLABS, PLASTERING, CERAMIC TILES FLOORING, WEATHERING COURSE, AND INNER STAIRCASE CONCEALED WIRING WITHOUT FITTINGS.

DETAILS OF AMENITIES TO BE PROVIDED IN THE FLAT ARE AS FOLLOWS.

S.NoParticularsDETAILS
1Foundation & StructuresSuitable Foundation, RCC Column with framed structure.
2BasementBasement height 3 feet from the existing ground level
3WallsAll Outer walls are 9’’ thick & inner walls are 4-½’’ thick.
4PlasteringCement Plastering in Ceiling & Inner walls with neat finish. Outer walls with rough plastering finish.
5FlooringVitrified Tiles of approx Rs.50/- & Tile Size 2’ × 2’. Any upgrades to the standard item will be extra
6DoorsMain entrance door with teak frame and teak panel door. All other doors with second quality teak wood frame and shutters flush door with enamel paint finish.
7WindowsAll windows & shutters with second quality teak wood frame with MS Grill. UPVC can also be installed in place of 2nd Quality Teak
8Bed RoomOne RCC loft of 2’0’’ wide in shorter span. With 3’ × 7’ × 1’6” Open Cup Board will be provided.
9KitchenGranite Cooking Platform with black Colour glazed the dadoing up to 2’ height in walls, one Stain Steel sink of size 2’ × 1’6’’ and 3’ × 7’ × 1’ open cup board and loft in Shorter span, provision for Exhaust Fan.
10ToiletCeramic Flooring Glazed Titles up to 7’ height one white IWC or EWC (Parryware) with flushing system and ‘two in one’ tap for water inlet and provision for geyser connection (Parryware or Metro). ( Any upgrades to the standard items will be extra)
11DiningOne White Color wash basin with tap .
12Paint FinishCeiling Finish – White Wash. Inner wall finish with putty (premium) and Outer wall finish (Ace) – Emulsion Paint.
13Electrical WorkThree phase power provision with fully concealed wiring good quality modular switches.